Project Description
The project includes foundation excavation at depth of 9 metres from the surface, Site Setup & Grading for the site using: 2 Tracked Excavators / 1 Piling Machine / 3 Dump Trucks.
Scope of Work
- Site Setup & Garding
- Bored Foundations
- Bulk Excavation
- Retaining Wall Anchors
- Anchor Beams
- Dewatering and Shoring
- Frame Bored Pile Work
- Bored Pile
- Testing Load
- Rock Foundation Grouting