Project Description
The Rehabilitation road includes: asphalt patching , asphalt resurfacing, filling cracks & replacing road signs works for total 4270 sqm.
Scope of Work
- Filling cracks and repairing minor defects on the road surface.
- Fix the shoulders and sideways slopes of the road
- Clean storm water drainage facilities and carry out minor repairs to concrete structures.
- Covering the road surface with new layers.
- Replacing the previous asphalt layers, and re-pave.