Project Description
The Rehabilitation road includes: asphalt patching , asphalt resurfacing & filling cracks for total 9640 sqm.
Scope of Work
- Filling cracks and repairing minor defects on the road surface.
- Fix the shoulders and sideways slopes of the road
- Covering the road surface with new layers.
- Replacing the previous asphalt layers, and re-pave.
- Recreation of some parts of the road under which the base layer collapsed.